| Chatsworth Products
We use cookies to personalize content and to analyze our traffic. You consent to cookies if you continue to use this website. To find out more or to disable cookies view our Privacy Policy. X
 

I Support: Optimize Structure in Your Cabinet Ecosystem

December 21, 2017 The process of managing white space begins with a focus on the data center cabinet. Primarily because a cabinet’s purpose is to hold and stack equipment vertically.  There are two main considerations: cabinet footprint and cabinet load bearing capacity. Find out more in today's post.

Industrial Enclosure Selection Guide for IT Professionals Now Available

December 19, 2017 As networks expand into nontraditional spaces or harsh environments, IT professionals are being challenged to ensure sensitive equipment is properly protected. A new white paper by CPI offers guidance for selecting industrial enclosures, understanding protection ratings and considerations for accessories.

8 Do's and Don'ts for Successful Data Center Migrations

December 14, 2017 With the increasing focus on colos and consolidation, data center migrations are more prevalent than ever. Yet every data center manager knows that these moves require careful planning and efficient execution. View Sunbird's infographic to discover tips and tricks to help win at data center moves.

Tech Tip: Breakers Tripping Because of Inadvertent Plugging In of Outlets?

December 12, 2017

Even data center personnel with the best of intentions can bring the network down by inadvertently plugging equipment into an unused outlet. There may be a simple fix. Consider CPI's Switched eConnect® PDU.

Easily Add Dual-Factor Security to Existing Card-Activated Locks

December 07, 2017 If you're evaluating new cabinet level security systems, and are looking to reduce deployment time and costs, check out our fingerprint-activated biometric access card. It's fully compatible and works seamlessly with most existing employee ID systems. No upgrades needed.

Important Infrastructure Considerations: Mission Critical Earthquake Preparedness

December 05, 2017 When it comes to building in a seismically active city, there are unique architectural and engineering challenges. Review key considerations regarding the selection of infrastructure elements, the management of space, building code compliance, and reducing costs in the face of adversity.
FirstPrevious1NextLast
4/26/2024 3:41:57 AM