| Chatsworth Products
We use cookies to personalize content and to analyze our traffic. You consent to cookies if you continue to use this website. To find out more or to disable cookies view our Privacy Policy. X
 

3 Free Tools for an Effortless Design Layout

November 26, 2013 Whether you need to simply brainstorm layout ideas or actually draft a new data center architecture Chatsworth Products (CPI) offers free Visio and CAD Shapes of many of our popular products, as well as BIM files for download. Details here...

Tech QA: What is the Optimum Vertical Exhaust Duct Height for my Data Center?

November 21, 2013 A data center professional recently asked Ian Seaton, Chatsworth Products’ (CPI) global technology manager, a question about the optimum VED height for a data center. Here's the answer...

New Generation of GlobalFrame Cabinet Meets UL 2416, Supports up to 3,000 Pounds

November 14, 2013 Chatsworth Products’ (CPI) GF-Series GlobalFrame® Gen 2 Cabinet System now complies with the UL 2416 requirement and features unmatched strength, supporting up to 3,000 pounds. Read on to see additional features ...

Free Webcast: “Cabling Architectures and Power Management in the Data Center”

November 14, 2013 Chatsworth Products (CPI) will present “Power Management Tracking and Optimization” as part of a free, two-part webcast produced by Cabling Installation & Maintenance, on Nov. 20 at 1 p.m. EST. Details here...

Virtual Event: See CPI’s Latest Solutions at the Data Centre Infrastructure Summit 2013

November 11, 2013 If you’re looking to improve efficiency and reduce your data center costs, then you should attend Anixter’s Data Centre Infrastructure Summit on 13 Nov. from 8:30 a.m. to 5 p.m. GMT. Here's why...

CPI to Showcase eConnect PDUs at DatacenterDynamics Converged Toronto

November 08, 2013 Chatsworth Products will highlight the power of its eConnect PDU line at the DatacenterDynamics Converged Toronto, to be held at the Allstream Centre on Nov. 13. See what CPI's eConnect PDUs have to offer...

This Colocation Provider Turned to CPI’s Cold Aisle Containment Solution. The Result: Power Usage Was Cut in Half

November 06, 2013 It’s no news that the electric bill is often the highest bill in a data center. And with data center traffic expected to increase threefold within four years, having an efficient solution in place is a must. Here's the story of how a colocation provider was able to cut its power consumption in half using CPI's Cold Aisle Containment Solution.

How to Get the Strength and Stability of a Cabinet in an Open Architecture Solution

November 01, 2013 Many enterprises opt open architecture as a means to drive down costsmakes moves, adds and changes to equipment and cabling easy. Chatsworth Products’ (CPI) open architecture solutions provide all the cable and equipment support necessary for today’s evolving IT landscape. Here's the story...
FirstPrevious1NextLast
11/21/2024 1:09:10 AM